Overview
After a year and a half of working with City Wide Facility Solutions, Rolling Hills Community Church in Nashville entrusted City Wide with a major project that involved a full refinishing of their gym floor—a unique granwood surface that required extensive preparation, custom finishes, and precision work.
Challenges
The gym’s floor showed significant wear and had previously been treated with an incompatible finish, resulting in a rough, uneven surface. The church needed more than a cosmetic update; the floor required structural restoration to address both cracks and surface wear. City Wide’s Nashville team, led by Jason Streger, assessed the floor’s condition and determined that a multi-step refinishing approach would best address the floor’s needs.
Solutions
City Wide designed a custom refinishing process tailored to meet the church’s needs. The process incorporated an epoxy-based paint and clear coat finish to ensure a durable, long-lasting surface. Planned over 10 days, the project was executed to minimize disruption by isolating the gym area while keeping the rest of the facilities open.
- Preparation: The process began with rough-sanding the floor to remove the existing damaged surface and expose the raw wood underneath. After sanding, the team conducted a thorough cleaning to remove dirt, dust, and debris, ensuring proper adhesion of the epoxy coating. Professional-grade equipment was used to control dust hazards, safeguarding both workers and the surrounding environment. This careful preparation laid the groundwork for a smooth and even finish, critical for long-term durability.
- Application: For the application phase, initial plans to apply the epoxy with a T-bar were adjusted in favor of rolling, which provided a smoother and more even application. The process included two layers of epoxy base coat, precise sport line painting, and a final clear coat for added protection and enhanced durability.
- Durability and Maintenance: The epoxy coating was selected for its exceptional resilience in high-traffic areas. Its hardened surface resists wear and requires minimal upkeep, with only an annual clear coat needed for maintenance.
This approach not only addressed visible wear but also reinforced the floor’s durability, enhancing the longevity of the gym’s most utilized space.
Key Management and Communication
City Wide’s project management capabilities were critical to maintaining the project timeline and ensuring quality. To keep the project on track, the team conducted daily check-ins with their vendor and provided regular updates to Rolling Hills Community Church. Additionally, the project manager was regularly onsite, promptly addressing any issues that arose.
Results
The refinished gym floor transformed the look and feel of Rolling Hills Community Church’s facility, providing a professional-grade surface that is both visually appealing and exceptionally durable. The epoxy coating created a smooth, uniform surface that can withstand high traffic while requiring minimal maintenance.
Following the success of this project, City Wide has expanded its work with Rolling Hills Community Church and is now assisting with remodeling a newly acquired church location. This continued partnership reflects City Wide’s dedication to delivering top-quality solutions and building trusted relationships with clients.
Why City Wide?
City Wide Facility Solutions has been a leader in building maintenance since 1961, providing expertise in janitorial services, commercial cleaning, and over 20 additional facility solutions. By prioritizing exceptional client care and precise project management, City Wide ensures each facility is maintained to the highest standards, saving clients time and reducing operational stress. Through these efforts, City Wide continues to be the go-to partner for organizations seeking long-lasting, impactful facility solutions.